boat ride back to our cabin after a visit to Camp Island
A post showing the Karluk Lake crew in action. We were only in the field for 2 weeks but we opened up 50 1X1 meter squares and finished them all. This ended up as about 50 cubic meters of dirt. That's a lot of dirt to move! And we also had to move it all back into the holes when we were done. A wheelbarrow really helped with the backfilling. We carefully backfilled to make the structure look like it had before we started digging.
But despite all the hard work we still had some time for play!
Patrick
 |
| Alex's homemade playing cards |
 |
| Crew using Alex's home made cards! |
 |
| WWP on a bug free day! |
 |
| KOP, MAP and WWP leaving cabin for site in the morning |
 |
| KOB on a day when head nets were needed |
 |
| MAP on screen |
 |
| on the screen early in the dig |
 |
| the first squares to the bottom in the main room |
 |
| KOB going for the bottom in the midden dump |
 |
| Final day and KOB is exhausted - we still have to finish main room AND backfill |
 |
| All done with backfilling - we left the hearth on top and made the structure look like it did before we started |
 |
| Alex uncovering the bench and wall in main room |
No comments:
Post a Comment